Context

  • Very old infrastructure
  • Lack of industrial land
  • High maintenance cost (average 350 million / year)
  • Low draft (7 m)

CHARACTERISTICS OF THE WORK

  • Construction of a 450 m long and 160 m wide mole
  • Draft: 8 to 10 m