You are here

Back to top

Creation of a mineral terminal

PROJECT DESCRIPTION

  • Construction of new wharves
  • Backfill of 9 ha of pier
  • Wharf Repairs 13 and 14 Storage Area Expansion
  • Installation of conveyor belts

EXPECTED RESULTS

  • Ability to accommodate conventional vessels with a draft of 13.5 m
  • Enable operators to achieve economies of scale on extra port costs
  • Increase the competitiveness of the Port of Abidjan
  • Have storage space

ETAT D'AVANCEMENT DU PROJET